2011 Holiday Rambler

Aluma-Lite C Series M-31WBS Ford V10 Specs

Specifications

Floor Plan

Identification
Type
Class C
Drivetrain Warranty (Months / Miles)
60 / 60000
Revision Status
New
Drivetrain / Chassis
Engine Type
V10
Displacement (l)
6.8
Horsepower
305
Fuel Type
Gas
Fuel Capacity (gal / L)
55 / 208.2
Engine Brand
Triton®
Chassis Brand
Ford
Specification
Maximum Sleeping Capacity
8
Number Of Slideouts
1
Length (ft-in / m)
32' 4'' / 9.9
Interior Height (in / mm)
82 / 2082.8
Air Conditioning (BTUs)
13500
Heater (BTUs)
N/A
Holding Tanks
Fresh Water Capacity (gal / L)
51 / 193.1
Gray Water Capacity (gal / L)
26 / 98.4
Black Water Capacity (gal / L)
26 / 98.4
Propane Capacity (gal / lbs)
9.9 / 42
Water Heater Tank (gal / L)
6 / 22.7
Interior Features
Master Bedroom
Standard
Kitchen Dinette
U-shaped Dinette
Interior Flooring Type
Vinyl
Television
Standard
DVD Player
Optional
Rear Video Camera
Optional
Exterior Features
Slideout Awning
Standard
Leveling Jack Type
N/A
Power Retractable Entry Steps
Not Available
Research another motorhome
Go
Truck deals, pricing and values
Go